MARRIOTT TIMBER LODGE PHASE 3

South Lake Tahoe, CA

General Contractor for this 86,000 SF, 5-level timeshare building with an alpine style sloped structural steel roof. Work included 57-units, 1 elevator, and connections to the existing buildings.

Completed 2008
$21,700,000

MARRIOTT SHADOW RIDGE RESORT PHASE 8
Palm Desert, CA

General Contractor for these new three 3-story timeshare buildings totaling 105,000 SF. Work included 72-units, guest amenities, and extensive site work.

Completed 2014
$16,300,000
MARRIOTT VACATIONS PIER 2620 HOTEL
San Francisco, CA

General Contractor for the renovation of this luxury timeshare property with high-end contemporary finishes, including 233 guestrooms and 25,000 SF of lobby/sales center, lounge, and back of house spaces.

To be Completed 2019
$13,000,000
WELK RESORTS BUILDINGS B & C
Truckee, CA

General Contractor for these two new 4-story timeshare buildings totaling 153,400 SF located in the village of NorthStar. Work included 70-units, sales center, and subterranean parking.

Completed 2017
$47,000,000
PEPPERMILL CASINO HOTEL TOWER
Reno, NV

General Contractor for this new 478,100 SF, 18-story hotel tower clad in an elegant combination of curtainwall glazing system and EIFS panels. Work included 600-rooms/suites and 26,500 SF of basement level support areas.

Completed 2008
$107,600,000
MARRIOTT RITZ CARLTON
Truckee, CA

General Contractor for this 87,000 SF 6-story hotel. Work included 57 guestrooms with lock-off units and landscaping/hardscape improvements.

Completed 2008
$31,300,000
MARRIOTT TIMBER LODGE PHASE 2
South Lake Tahoe, CA

General Contractor for this new 105,000 SF, 6-story hotel including 56-rooms and site improvements.

Completed 2006
$21,700,000
TONOPALO RESORTS
Tahoe Vista, CA

General Contractor for this new 45,000 SF fractional timeshare property consisting of multiple 3-story buildings ranging from 2,500 SF to 3,500 SF. Work included 19-units and consisted of high-end amenities such as private exercise facility, clubhouse with lounge, library, fireplace, media room, and a 300 FT dock with docking buoys.

Completed 2004
$14,700,000
MARRIOTT DECLAN SUITES
San Diego, CA

General Contractor for the remodel of this 27-story downtown San Diego hotel. Work included the remodel of the arrival lobby / check-in / guest amenities area, restaurant, bar, fitness center, indoor heated pool, 254 units, modernization of existing elevators, and new roof-top mechanical equipment.

Completed 2017
$28,200,443
WINNEBAGO TRIBE OF NEBRASKA
(WINNAVEGAS CASINO-HOTEL)
Sloan, IA

General Contractor for this new hotel attached to an existing casino building. Work included 80-rooms and a new registration/lobby, meeting and conference rooms, swimming pool, and back-of-house areas.

Completed 2012
$10,700,000
EMBASSY VACATION RESORT PHASE 4
South Lake Tahoe, CA

General Contractor for Phase 4 of the 51,400 SF, 6-story Sunterra Resorts Embassy Vacation Resort timeshare property with an alpine style sloped structural steel roof. Work included 40-units, miscellaneous support space, parking lot expansion, and an upgrade of all landscaping for the entire property.

Completed 2006
$18,700,000
SEDONA SUMMIT PHASES 3 & 4
Sedona, AZ

General Contractor for these new Sunterra Resorts high-end finish timeshare buildings.  Phase 3 work included a 20,000-SF, 19-unit building with an activity/sales center, spa, and off-site improvements.  Phase 4 work included a 52,800 SF building with 48-units each at 1,100 SF outfitted with high-end finishes.

Completed 2008
$23,100,000